Construction of the Harbor of Refuge, which protects the Breachway and the Port of Galilee, began in 1890 with the construction of the east and west jetties.  The breakwater was not completed until 1910 with the completion of the center jetty. The Breachway that connects the Harbor of Refuge with the Point Judith Pond was completed in 1910, and the harbor at the mouth of the pond was dredged and a dock constructed in 1935 to create the Port of Galilee.